Blast pot refurbishing and pressure testing

Posted October 9, 2023

Blast pot during hydraulic test

Blast pot on arrival

Blast pot on arrival

Blast pot during hydraulic test

Powder coated blast pot

Powder coated blast pot

It is a legal requirement for a vessel such as a blast pot to be hydraulically tested between 12 and 14 months, depending on your insurance provider.

J.Reid Engineering can carry out full refurbishment, shotblasting, pressure testing (test certificate provided) and powder coating service to make your blast pot look like new.

Contact us for further details.